What is in the current adopted plan. What was completed. What is underway. What remains. What it cost. And what the lagoon is doing now.

The plan has evolved over time; this is not the original 2016 project count or a statement that all 403 were scheduled for completion by 2026. Homeowner projects are counted separately.

403403 projects in the current adopted planCommunity projects are separate from homeowner projects. The plan has evolved over time; this is not the original 2016 project count or a statement that all 403 were scheduled for completion by 2026.
171Outside those two statusesArithmetic remainder, not an official County status label.
140 complete92 in progress171 outside both

“In progress” can include projects in design, under contract or under construction. It does not mean all 92 have bulldozers on site.

Open the project-status evidence ↗

Posted September 2026 progress report

The County's posted September progress report lists 140 completed community projects, 2,697 completed homeowner projects and 1,035 completed conversions to sewer. These are different measures; they are not added together as a single project total.

  • Titusville clam restoration: The September report records completed seeding of 24 million native clams across eight acres near Titusville.
  • Eau Gallie muck dredging: Dredging began August 7, 2026; the September report puts it at about 20% complete.
  • Cocoa Beach Golf muck capping: Sand capping began June 22, 2026; the first three-inch sand layer is about 60% complete in the September report.

These are implementation milestones from the County's posted September 2026 progress report. A seed count is not a survival estimate or a measured lagoon-wide benefit, and a construction percentage is not a water-quality result. Source: September 2026 SOIRL progress report (posted for the September 18, 2026 meeting) ↗

Money flow

Every category answers a different question.

$539.7Mcollected in the SOIRL Trust Fund
$119.8Mcumulative actual expenditures across all projects
$335.2Massociated with in-progress work
$84.7Mcalculated difference: collected − (spent + funding in progress). Not a cash balance or unrestricted funding available.
+$127.3M in outside grants leveraged

Why hasn’t all the money been spent yet?

Engineering, permits, procurement, contracts and construction precede final payment. Expenditure is a lagging measure of infrastructure progress. The in-progress category is not established here as a legally committed total.

See every dollar and project ↗

Environmental return

What has the completed work been designed to accomplish?

186,885

pounds of total nitrogen kept out each year

Modeled annual reduction associated with completed projects.

Modeled estimate · County dashboard · August 17, 2026
156,728

pounds of one-time nitrogen removal

Counted separately because a one-time cleanup cannot be added to an annual rate.

Modeled estimate · one-time benefit
415,803

additional pounds of total nitrogen per year

Modeled annual reduction expected when projects currently in progress are completed.

Projected from work in progress
748,105

pounds of total nitrogen per year under the full plan

Modeled annual reduction if the currently adopted project plan is completed.

Projected estimate · full plan

Total nitrogen means all forms of nitrogen entering the water. These numbers are engineering estimates of pollution prevented or removed, not pounds physically sampled from lagoon water. “Per year” is an annual estimate; one-time removal is counted separately.

See how the County calculates project benefits ↗